Hellenic Engineering & Megaproject Lifting Solutions

Used Construction Hoist Suppliers & Exporter for Greece Market

Precision-refurbished rack & pinion vertical hoists compliant with EN 12158 safety directives. Directly exported from our 30+ acre logistics hub to Piraeus, Thessaloniki, and major Aegean metropolitan infrastructures.

100%

EN 12158 / CE Verified

18-22 D

Direct Transit to Piraeus

30+ Ac

Holding Yard & Testing Base

YOM 19-23

Late Model Prime Fleet

Direct Yard Allocation · Athens & Ellinikon Ready

High-Spec Used Vertical Hoists for Greek Contractors

Pre-qualified twin-cage personnel and materials hoists ready for instant flat-rack containerization, equipped with full variable frequency drives (VFD) and anti-drop progressive safety apparatus.

High-Quality DAHAN SC200/200 Construction Hoist for Greece Greek Spec Checked

DAHAN SC200/200 Twin-Cage Hoist (YOM 2019-2023)

Payload: 2 × 2,000 kg
Speed: 0 - 46 m/min (VFD)
Cage Dim: 3.2 × 1.5 × 2.5 m
Safety: SAJ40-1.2 Anti-Fall
Wholesale GAOLI SC200/200 Construction Hoist Greece Exporter Verified YOM

GAOLI SC200/200 Heavy Material/Personnel Hoist

Payload: 2 × 2,000 kg
Mast Section: 650 × 650 × 1508
Braking: Electro-Magnetic Auto
Motor: 3 × 11 kW per Cage
Best TEWEI SC200/200 Construction Elevator for Piraeus Port Delivery Zero-Corrosion Mast

TEWEI SC200/200 High-Rise Builder Elevator

Lifting Height: Up to 250 m
Inverter: Schneider / ABB
Structure: Hot-Dip Galvanized
Rack Module: Module 8 Heavy Duty
Refurbished XCMG SC200/200 Hoist for Greek Construction Sites Tier-1 OEM Rig

XCMG SC200/200 Modular Construction Hoist

YOM: 2019 - 2023
Control: Smart PLC Interface
Overload: Digital Sensor Unit
Efficiency: Low Amperage Surge
Market Dynamics & Structural Transformation

The Renaissance of Greece's Vertical Infrastructure Ecosystem

The Greek construction market is undergoing an unprecedented structural expansion, spearheaded by landmark projects such as The Ellinikon—Europe's most ambitious metropolitan urban development project—alongside the construction of Athens Metro Line 4, the ongoing infrastructural expansion in Thessaloniki, and extensive ultra-luxury hospitality upgrades across Crete, Rhodes, and the Cycladic islands.

Following a decade of conservative capital expenditures, Tier-1 and Tier-2 Greek general contractors (including GEK TERNA, Ellaktor, AVAX, and Mytilineos) encounter severe supply deficits in heavy vertical transport equipment. Procuring factory-new hoists often imposes lead times exceeding 7 to 10 months with elevated capital outlays. Our inspected, late-model used hoists (YOM 2019–2023) bridge this operational bottleneck, eliminating lead times while trimming CAPEX by 45% to 60% without compromising Hellenic Occupational Health and Safety (ELINYAE) standards.

  • Compliance with Hellenic Decree 395/94 & EN 12158: Strict testing of mechanical drop-stops, interlocked limiters, and emergency descents.
  • High-Salinity Anti-Corrosion Protection: Heavy zinc-galvanized mast sections and epoxy primer coatings engineered for coastal marine atmospheres.
  • Direct Piraeus Port Maritime Routing: Pre-bundled packaging allowing direct discharge at COSCO Piraeus Terminal with expedited T1 transit customs clearance.
Send Inquiry Now

Hellenic Engineering Compliance Index

Technical baseline applied to all machinery bound for Greek jurisdiction installations:

Harmonized Safety Standard EN 12158-1 / Directive 2006/42/EC
Electrical Compatibility 400V ± 10%, 50Hz (PPC / HEDNO Grid)
Safety Device Recalibration SAJ Progressive Anti-Fall Unit
Seismic Resistance Anchorages Eurocode 8 (Anti-Seismic Bracing)
NDT Mast Inspection Ultrasonic Weld & Magnetic Particle
Customs Tariff Classification HS Code 8428.10 (Lifting Machinery)
Pre-Shipment Documentation EUR.1 Assistance / Original Nameplate / COO
Global Status vs. Hellenic Applications

Engineered for High-Density Greek Job Sites

Vertical logistics solutions designed specifically to address high ambient temperatures, seismic dynamics, and intense continuous duties across diverse Greek job environments.

Coastal High-Rise Towers (Ellinikon)

Modern coastal architectural developments like the Riviera Tower demand vertical hoisting heights exceeding 200 meters under severe Mediterranean wind loads and marine salt aerosol exposure. Our heavy rack-and-pinion hoists feature high-frequency variable speed control, reinforced guide rails, and specialized corrosion-inhibited structural alloys.

Urban Retrofit & Historic Façades (Athens)

Navigating restricted street corridors in central Athens and Thessaloniki requires compact ground enclosures, minimal floor footprint cages, and low acoustic impact gearboxes. We configure SC100 and SC200 single/twin modules with micro-movement floor leveling to allow seamless docking within historic urban confines.

Insular Island Resort Projects (Cyclades / Crete)

Constructing 5-star hospitality infrastructure across Mykonos, Santorini, and Crete faces severe logistics constraints and remote technical conditions. Our units are packaged with modular mast segments, pre-labeled wiring harnesses, and simplified auto-erection jibs designed for rapid assembly via lightweight mobile cranes.

Next-Generation Lifting Engineering

Technical Roadmap: Upgrading Secondary Machinery for 2025–2030

How Zhongqiang transforms inspected second-hand hoists into high-efficiency, digitally monitored industrial vertical lifting platforms.

Phase 01 · Electromechanics

Full VFD Vector Control

Eliminating starting amperage spikes on fluctuating Greek construction grid connections, ensuring smooth acceleration, soft landings, and reducing rack wear by 35%.

Phase 02 · Predictive Telematics

IoT Dynamic Health Monitoring

Integration of vibration sensors, brake pad thickness indicators, and wireless cycle counters allowing Greek plant managers real-time telemetry from remote sites.

Phase 03 · Energy Conservation

Regenerative Braking Systems

Capturing gravitational kinetic energy during descending cycles to feed power back into the job site grid, lowering net energy usage on major development parcels.

Phase 04 · Structural Integrity

Precision Ultrasonic Testing

Every structural weld, pin hole, and drive pinion undergoes comprehensive non-destructive testing (NDT) to ensure zero latent fatigue before export packaging.

Export Ready Inventory

Comprehensive Crane & Hoist Solutions for Greece

Combining heavy-duty rack-and-pinion hoists with high-load QTZ/MC tower cranes to provide complete site vertical handling packages for Hellenic building contractors.

High-Quality DAHAN SC200/200 Construction Elevator Greece Twin Cage

DAHAN SC200/200 Construction Hoist

Capacity: 2 × 2,000 kg
Speed: 36 m/min
YOM: 2019-2023
Status: Certified
ZOOMLION QTZ200 7020-12 Tower Crane for Port of Thessaloniki 12 Ton Crane

ZOOMLION QTZ200 7020-12 Tower Crane

Max Load: 12,000 kg
Jib Length: 70 m
Tip Load: 2,000 kg
Type: Topkit Design
DAHAN QTZ100 6013-6 Tower Crane for Greek Commercial Projects 6 Ton Crane

DAHAN QTZ100 6013-6 Flat-Top Crane

Max Load: 6,000 kg
Jib Length: 60 m
Tip Load: 1,300 kg
YOM: 2019-2023
YONGMAO STT153 7015-10 Crane for European High-Rises Flat-Top

YONGMAO STT153 7015-10 Flat-Top

Max Load: 10,000 kg
Jib Length: 70 m
Tip Load: 1,500 kg
Condition: Refurbished
TEWEI SC200/200 Dual Passenger Hoist Greece Dual Cage

TEWEI SC200/200 Dual Passenger Hoist

Drive: Tri-Motor Helical
Brake: SAJ40 Anti-Fall
Max Height: 200+ m
YOM: 2019-2023
XCMG SC200/200 Material and Personnel Hoist for Greece Standard Cage

XCMG SC200/200 Personnel Hoist

Load Class: 2,000 kg / Cage
Galvanized: Yes (Mast & Cage)
Safety Device: Certified Factory
YOM: 2019-2023
POTAIN MC120-6 Hammerhead Tower Crane Europe Ready European Standard

POTAIN MC120-6 Hammerhead Crane

Max Load: 6,000 kg
Jib: 60 m
Tip Load: 1,200 kg
YOM: 2013-2014
ZOOMLION QTZ250 7025-12 Heavy Duty Crane for Greece Infrastructure Heavy Civil

ZOOMLION QTZ250 7025-12 Tower Crane

Max Load: 12,000 kg
Jib: 70 m
Tip Load: 2,500 kg
YOM: 2019-2022

China-to-Hellas Maritime Transit Architecture

Dedicated shipping schedules from East China Ports directly to Greek maritime terminals:

Primary Loading Ports Shanghai / Ningbo / Qingdao
Primary Destination Terminals Piraeus (PCT) / Thessaloniki (ThPA)
Average Sea Transit Duration 18 – 24 Calendar Days
Containerization Method 40ft High Cube (HC) + Open Top (OT)
Lashing & Securing Norms IMO / DGUV Heavy Cargo Directives
Customs & Tariffs Support T1 Transit, Commercial Invoice, Packing List
Supply Chain Assurance

Turnkey Export Engineering: Yard-to-Jobsite Traceability

Importing capital construction equipment from Asia into the European Union demands rigorous paperwork, zero-fault packaging, and comprehensive logistics management. Zhongqiang operates its own dedicated in-house forwarding department and skilled rigging crews on our 30+ acre facility in Huai'an, Jiangsu.

Before any container doors close, every single mechanical assembly undergoes strict dismantling, sequential code-marking, rust-proofing, and heavy steel lashing. Our buyers in Athens, Patras, and Heraklion receive complete video documentation covering factory testing, dynamic braking trials, loading steps, and container sealing numbers.

Technical & Commercial FAQ

Frequently Asked Questions by Greek Plant Directors

Everything you need to know about safety certifications, shipping logistics, customs processing, and on-site commissioning across Greece.

Do used Chinese construction hoists comply with Hellenic ELINYAE and EU EN 12158 safety directives?
Yes. Every unit selected for export to the Hellenic Republic is verified against the European Machinery Directive 2006/42/EC and EN 12158-1 standard for temporary builder lifts. Before shipping, the progressive safety devices (SAJ anti-fall mechanisms) are calibrated and certified. In addition, interlocking door systems, upper/lower travel limit switches, and ultimate over-travel safety mechanisms undergo 100% pre-delivery inspection trials.
What is the standard sea freight transit timeframe to Piraeus and Thessaloniki?
Shipments departing major East China container ports (such as Shanghai, Ningbo, and Qingdao) typically reach the Piraeus Container Terminal (PCT) within 18 to 24 sea transit days via direct liner routes through the Suez corridor. Feeder shipping to Thessaloniki or direct transshipment onward to island project sites (e.g., Heraklion, Crete) usually adds roughly 3 to 5 business days.
Can our Greek technical staff inspect equipment prior to settlement and loading?
Absolutely. We support three transparent inspection pathways: (1) Direct on-site physical evaluation at our 30+ acre facility in Huai'an, Jiangsu; (2) Third-party technical inspection by internationally accredited testing bodies such as SGS, TÜV, or Bureau Veritas; or (3) Real-time live high-definition video walkthroughs where our engineers test-run the hoists, display exact serial plates, and verify structural weld integrity before final packing.
How do you handle spare parts provisioning and replacement rack & pinion components?
All our hoists (DAHAN, XCMG, GAOLI, TEWEI) feature international standardized Module 8 rack-and-pinion dimensions. We provide a tailored 2-year maintenance package with each exported unit, containing critical wear items such as spare drive rollers, contactors, guide wheels, limit switches, and brake linings. In emergency breakdown scenarios, priority courier air shipments can be dispatched to Athens International Airport within 48 to 72 hours.
What documents are supplied to support clearance through Greek Customs?
Our company holds full, independent national import and export rights. For every export shipment to Greece, we issue the official Clean Bill of Lading, Commercial Invoice, Packing List with detailed container load breakdowns, Certificate of Origin (COO), and machinery nameplate authenticity records required for prompt release by Hellenic customs officials.

Equip Your Greek Jobsite with Inspected Vertical Lifting Systems

Cut equipment procurement lead times and capital expenses on your high-rise, commercial, or urban renovation project. Connect directly with our engineering and export team for a tailored quote.

Send Inquiry Now