DAHAN SC200/200 High-Speed Hoist (Manila Spec)
Twin-cage 2x2,000kg load rating, frequency conversion control for smooth acceleration in residential condominium projects across BGC and Ortigas.
View Dahan SC200/200Premium late-model SC200/200 rack-and-pinion builder hoists thoroughly tested, recalibrated, and pre-rigged for high-temperature and coastal Philippine projects.
Twin-cage 2x2,000kg load rating, frequency conversion control for smooth acceleration in residential condominium projects across BGC and Ortigas.
View Dahan SC200/200
Hot-dip galvanized mast options engineered to withstand salty breezes in Manila Bay reclamation developments and coastal high-rises.
View Gaoli SC200/200
Features progressive anti-fall safety brakes and modular cage layouts engineered for rapid assembly in dense Makati and Quezon City plots.
View Tewei SC200/200
Designed for high cycle frequencies on transport interchanges and 40+ storey structural concrete works. Low motor wear, high efficiency.
View XCMG SC200/200A data-backed look at how the Philippines' infrastructure expansion drives demand for certified, cost-effective secondary vertical transportation machinery.
Metro Manila represents one of Southeast Asia's densest urban corridors. Prime growth clusters like Bonifacio Global City (BGC), Makati Central Business District, Ortigas Center, and the emergent Manila Bay Reclamation Area continue to push vertical boundaries past 45 to 65 storeys. Concurrently, government-led capital projects under the "Build Better More" initiative—including the Metro Manila Subway Project (MMSP) and the North-South Commuter Railway (NSCR)—demand rugged vertical transport to move thousands of workers and hundreds of metric tons of finishing materials every single shift.
In this intensive climate, procurement directors face sharp tradeoffs. Procuring brand-new European or top-tier domestic hoists often involves 16-to-24 week manufacturing backlogs and substantial upfront capital outlays that strain project cash flows. Sourcing verified, low-hour used construction hoists from reliable Chinese supplier yards solves this bottleneck, offering immediate shipment and cutting capital equipment expenses by upwards of 60% without compromising site safety.
Globally, EPC contractors are transforming fleet management from capital acquisition to circular lifecycle optimization. Used construction hoists from premier Chinese manufacturers—DAHAN, GAOLI, TEWEI, and XCMG—benefit from standardized production tolerances, Q345B high-tensile manganese steel chords, and globally universal rack-and-pinion geometry (Module 8).
Because these brands command massive market share in domestic infrastructure, certified second-hand units aged between 2019 and 2023 represent exceptionally young working assets. The structures possess minimal fatigue cycles, while key moving elements—helical gearboxes, safety drop arresters, and VFD inverters—can be completely refreshed and tested prior to export, giving Philippine fleet operators and equipment rental outfits an asset capable of serving multiple consecutive 36-month high-rise projects.
Operating in Metro Manila requires strict adaptation to Pacific typhoons, high seismic loads, and corrosive coastal atmosphere.
Manila regularly experiences Category 3 to 5 typhoons under PAGASA gale advisories. Zhongqiang supplies heavy-duty wall tie-in frames calibrated for wind velocity pressures up to 200 km/h (NSCP Zone 1). Mast sections undergo ultrasonic weld testing to eliminate internal fatigue, ensuring structural stability when parked at non-working heights exceeding 150 meters.
Developments situated along Roxas Boulevard, Pasay, and Paranaque endure heavy saline humidity from Manila Bay. We offer customized refurbishment tiers including hot-dip galvanization on mast tubes, marine-grade zinc-rich epoxy primers, and IP65-sealed stainless electrical enclosures to prevent short circuits and premature oxidation.
Fluctuations in municipal power grids or on-site diesel generators across Luzon can trigger inverter tripping or motor coil burnouts. Our inspected units can be equipped with Schneider or INVT Variable Frequency Drives (VFD) paired with wide-voltage tolerance surge protectors (380V-440V ±15%, 60Hz compatible for Philippine utility specs).
| Technical Parameter | Standard Export Configuration | Manila Tropicalized Heavy-Duty Spec | Site Benefit in Metro Manila |
|---|---|---|---|
| Rated Lifting Capacity | 2 × 2,000 kg (Twin Cage) | 2 × 2,000 kg (Reinforced Chassis) | Simultaneous transport of 48 workers or palletized concrete blocks |
| Lifting Speed Range | 0 - 36 m/min (Direct-On-Line) | 0 - 63 / 0 - 96 m/min (VFD Infinitely Variable) | Doubles roundtrip turnover rate on towers over 40 storeys |
| Mast Section Dimensions | 650 × 650 × 1508 mm | 650 × 650 × 1508 mm (Q345B / Hot-Dip Galvanized) | Resists salt air oxidation; standard interchangeability across rental fleets |
| Safety Device Calibration | SAJ40-1.2 Anti-Fall Device | SAJ40-1.4 / SAJ50 with 1-Year Recertification | Complies strictly with DOLE-OSHC requirements for worker lifelines |
| Operating Power Standard | 380V / 50Hz Standard | 220V / 380V / 440V @ 60Hz Localized Motors | Plug-and-play compatibility with Meralco utility and on-site gensets |
Receive comprehensive pre-shipment video run-throughs, load-moment certifications, and complete customs clearance documentation within 24 hours.
Send Inquiry NowDirect supply advantages from our 30+ acre logistics hub in Huai'an, Jiangsu to the Port of Manila (South Harbor / MICT).
Used equipment reliability hinges on disciplined inspection. At our Huai'an yard, every second-hand construction hoist and tower crane passes through our certified engineering checklist before packing:
Critical load sections, cage hanger assemblies, and mast rack-pinion welds undergo non-destructive examination (NDE) to detect micro-cracks or metal fatigue.
Electric motors are bench-tested under 125% full load. Helical gear teeth backlash is micrometer-measured, and bearings exhibiting high acoustic vibration are renewed.
Progressive safety gear (anti-fall device) is subjected to specialized dynamic drop bench calibration with automated tripping velocity recorded and certified.
Logistics latency is the enemy of project schedules. Our dedicated marshalling facility in Jiangsu is situated within a 3-hour trucking radius of major maritime terminals (Shanghai and Taicang ports).
A full SC200/200 twin-cage hoist configuration with 100 meters of mast, enclosures, cable guide system, and tie-in sets efficiently packs into 2 × 40HQ High Cube shipping containers.
Integrating modern digital monitoring into inspected used hoists to bring older assets up to modern intelligent job-site standards.
Retrofitting precision digital load cells under cage mounting points. If gross mass exceeds 2,000 kg, an automatic audio-visual siren activates, cutting power to hoisting contactors until weight is normalized, eliminating dangerous overloading incidents.
Modern regenerative braking modules direct descending gravitational potential energy back into dynamic brake resistors or local sub-panels. This smooths current surges and slashes diesel generator consumption on sites lacking fixed grid taps.
Preventing uncertified personnel from operating hoist cages. Biometric scanners or RFID reader units ensure that only DOLE-accredited hoist operators can release the main brake system and initiate movement through tower shafts.
How Zhongqiang simplifies DOLE inspections, safety certification, and erection engineering for General Contractors in the NCR.
In the Philippines, construction vertical machinery must align with the Department of Labor and Employment (DOLE) Department Order No. 13 ("Guidelines Governing Occupational Safety and Health in the Construction Industry"). Before any hoist enters operational status on a Manila job site, it must pass mandatory structural and mechanical load testing overseen by an accredited third-party testing agency (such as SGS, Qualitest, or local DOLE-accredited inspection engineers).
Zhongqiang equips every machine with complete historical documentation, certified metallurgical test reports for mast bolts (Grade 8.8 and 10.9), original factory wiring schematics, and anti-fall safety brake drop calibration certificates. This eliminates bureaucratic delays during third-party inspection sign-offs.
Site structural engineers in Bonifacio Global City or Bay Area developments require concrete foundation calculations based on localized soil bearing capacities (often poor clay or sand reclamation).
We furnish turnkey engineering calculation sheets outlining vertical loads, horizontal tipping moments, tie-in bracket intervals (normally every 6 to 9 meters), and embedment anchor specs. Whether installing the hoist inside an elevator shear core or anchored externally along the curtain wall edge, our technical team provides the CAD layouts and structural formulas your project engineers require.
Explore our export-ready equipment. Every unit is inspected at our Huai'an yard and shipped with verified serial nameplates and pre-shipment condition dossiers.
60m jib with 1.3t tip load capacity. Ideal for medium-rise condominiums and commercial podiums in Quezon City and Pasig.
View SANY QTZ100
Twin-cage 2x2 ton configuration with verified 2019-2023 manufacture, tested overload sensors, and complete safety drop brakes.
View XCMG SC200/200
Flat-top architecture for tight overlapping jib radiuses in congested central business districts like Makati and BGC.
View Yongmao STT153
Top-tier 12-ton capacity for heavy precast segmental placement along the NSCR and expressway viaduct projects.
View Potain MC320-12
High-grade structural steel with heavy corrosion inhibition paint systems for extended lifespan in Philippine humid climates.
View Gaoli SC200/200
Equipped with precise slewing controls, full mast tie-in package, and genuine OEM cabin controls for operator precision.
View XCMG QTZ100
Optimized gear ratio delivers fast, vibration-free travel for high-rise worker rotations during peak morning shift changes.
View Tewei SC200/200
Standard 1.6m fishplate mast sections offering modular erection heights up to 200m anchored. Tested slewing ring and drive motors.
View Dahan QTZ100Essential guidance covering customs duties, testing compliance, transit times, and on-site assembly across Luzon.
Once equipment testing and container stuffing are completed at our Huai'an yard, containers are transported to Shanghai or Taicang port. Sea transit to Manila South Harbor or Manila International Container Terminal (MICT) typically takes just 7 to 10 days on direct liner services. Customs processing in the Philippines usually clears in 3 to 5 business days with standard import documentation.
We supply a complete export documentation suite including: Commercial Invoice, Packing List with detailed container component distribution, Bill of Lading, Certificate of Origin (Form E) allowing 0% or reduced customs duties under the ASEAN-China Free Trade Area, factory inspection test records, structural steel mill certificates, and anti-fall safety brake calibration certificates for DOLE accredited inspector sign-off.
Every unit undergoing export clearance is subjected to our 128-point inspection protocol. We conduct magnetic particle flaw testing on structural weld points, evaluate rack and pinion wear limits, perform drop test calibration of the progressive safety device, and supply complete HD video footage of the electrical cabinet and mechanical components running prior to dismantling and container loading.
Yes. One of the main advantages of procuring leading Chinese OEM hoists is component standardization. Standard Module 8 gear racks, driving pinions, guide rollers, SAJ anti-fall safety devices, limit switches, and Schneider electrical contractors are widely stocked by construction machinery distributors in Metro Manila, Bulacan, Cavite, and Cebu, ensuring zero prolonged downtime.
Yes. While domestic Chinese power runs on 50Hz, we can configure our export units with specialized 60Hz motors or high-grade Variable Frequency Drives (VFD) that automatically calibrate to incoming 380V-440V / 60Hz power lines. This eliminates motor overheating and protects components during prolonged operation in Manila's hot ambient conditions.
Absolutely. We welcome third-party inspection agencies such as SGS, BV (Bureau Veritas), or your appointed local Chinese agent to visit our 30+ acre warehouse base in Huai'an, Jiangsu. We also arrange real-time interactive video walkthroughs to examine weld seams, nameplates, test running operations, and container loading procedures.